Product Details
Place of Origin: China,Henan
Brand Name: ZS
Certification: API 11AX
Model Number: 5-1/2"X8-1/2"to20"X26"
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: Negotiable
Packaging Details: Metal or wooden case
Delivery Time: 15 work days
Payment Terms: T/T
Supply Ability: 1000sets/month
Type: |
Bow Type Spring Centralizer |
Material: |
Stainless Steel |
Central Multimedia: |
Central Machinery Parts |
Central Hydraulics Scissor Lift: |
Toyota Central Locking System |
Weight (KG): |
10 |
Use: |
Well Drilling |
Color: |
Customized |
Type: |
Bow Type Spring Centralizer |
Material: |
Stainless Steel |
Central Multimedia: |
Central Machinery Parts |
Central Hydraulics Scissor Lift: |
Toyota Central Locking System |
Weight (KG): |
10 |
Use: |
Well Drilling |
Color: |
Customized |
The composite centralizer is used during running and cementing operations to centralize casing. Made of advanced composite, with low coefficient of friction, heat resistant, and highly durable. Performs reliably even in extreme wellbore conditions,this centralizer withstands high-impact loading and is highly wear resistant.
It has a smooth, tapered construction to easily pass obstructions in the wellbore, suited for horizontal applications. Enables casing strings to reach total depth efficiently, provides optimal standoff for mud displacement, and greatly enhances cementing operations. Available in straight and spiral blade configurations.
Technical Parameter | ||||||
Spring Casing Centralizer | Size(In) | OD(mm) | IN(mm) | Height(mm) | Max Start-up Force(N) | Min Reset Force(N) |
20" | 680 | 512 | 575 | ≤16725 | ≥8363 | |
13-3/8" | 455 | 342 | 560 | ≤10853 | ≥5427 | |
9-5/8"*12-1/4" | 335 | 248 | 560 | ≤7117 | ≥7117 | |
7" | 235 | 181 | 560 | ≤4626 | ≥4626 | |
6-5/8"*8-3/4" | 238 | 171 | 560 | ≤4270 | ≥4270 | |
5-1/2”*8-1/2” | 235 | 142 | 560 | ≤2758 | ≥2758 |
Rigid Centralizer | 13-3/8" | 437 | 344 | 180 |
9-5/8"*12-1/4" | 305 | 248 | 120 | |
7" | 210 | 182 | 120 | |
6-5/8"*8-3/4" | 215 | 171 | 120 | |
5-1/2"*8-1/2" | 210 | 142 | 120 |
Semi-rigid Centralizer | Single Bow Spring Centralizer | Double-bow Spring Centralizer |
![]() |
![]() |
![]() |
Integral Centralizer | Rigid Centralizer | Rigid Roller Centralizer |
![]() |
![]() |
![]() |
A: We are factory.
A: Generally it is 1-5days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance.